Coordinated execution across multiple test cases

Build the campaign once.
Execute the full testing scope in one action.

Group related test cases around a release, regression cycle, feature, or delivery goal. Launch the campaign from one coordinated action, follow every test case as execution progresses, and keep the individual outcomes connected to one campaign-level result and history.

The interactive campaign on this page uses sample test data and simulated execution to explain the AXQA workflow.

Campaign Control
MULTI-TEST EXECUTION
Release 4.2 5 test cases
TC-101 Login
TC-102 Checkout
API-027 Create Order
TC-118 Permissions
API-031 Order State
Campaign focus Group the required test coverage
1 of 5 test cases
Group Coverage
Bring the test cases for one release, regression scope, feature, or delivery goal into the same campaign.
One Action
Launch the coordinated campaign without manually starting every included test case one by one.
Live Progress
Follow individual test case outcomes while the full campaign moves toward completion.
Shared History
Keep campaign context together while preserving the result of every underlying test execution.
Interactive campaign builder

Choose the objective. AXQA brings the test cases together.

Switch between example campaign scopes and see how a set of individual test cases becomes one repeatable execution unit without losing the identity or result of each test.

RELEASE CAMPAIGN

Release 4.2 Validation

Bring the critical authentication, checkout, permissions, and order-state coverage for the release into one coordinated execution scope.

CampaignCAM-042
ScopeRelease
Test Cases5
StatusReady
CAMPAIGN OBJECTIVE Validate the critical release path before deployment.
Included Test Cases
5 CASES
EXECUTION MODEL One campaign action starts the coordinated test scope.
Campaign operating model

Five layers turn separate tests into one controlled QA operation.

A campaign adds structure above the individual test cases: define the goal, group coverage, coordinate ownership, launch execution, and review the combined outcome.

Scope
Coverage
Ownership
Execute
Review
LAYER 01

Give the campaign one clear testing objective.

Define the release, regression cycle, feature, or validation goal the campaign represents so everyone understands why the grouped tests are being executed together.

OUTPUT One campaign with a clear QA purpose.
Campaign execution lab

One click starts the scope. Every test keeps its own result.

Run the selected sample campaign and watch AXQA move through the included test cases, update progress, preserve each result, and build the campaign-level execution outcome.

CAMPAIGN MISSION CONTROL Release 4.2 Validation
READY
Campaign Load scope
Execute Run cases
Collect Results
Campaign Outcome
History Save context
Campaign progress 0%
$ Ready to execute the selected AXQA campaign...
Choose Run Campaign to start the simulation.
Why campaign management matters

Individual test cases give detail. Campaigns give operational control.

One coordinated start

Launch the defined testing scope from one campaign action instead of manually initiating every included test case.

Visible campaign progress

See which test cases are waiting, running, passed, or failed while the full execution scope moves forward.

Keep individual detail

Campaign-level visibility does not replace the underlying test results. Each test case keeps its own execution outcome.

Repeatable campaign history

Use the same defined scope again for future regression or release cycles and compare execution context over time.

Campaign-level visibility

Every case answers a test question.
The campaign answers whether the scope held together.

AXQA keeps the execution result of each included test case while adding a combined view for the complete campaign. A failed test remains visible as a failed test — and the campaign can immediately show that the planned validation scope needs attention.

TC-101Passed
TC-102Passed
TC-118Failed
CAM-042 FAILED Review required
Build the cases. Then coordinate the scope.

Test Case Management creates the assets.
Campaign Management brings them together.

Continue through the AXQA workflow to see how test definitions, API validation, campaign execution, and reporting stay connected.